Project

General

Profile

Support #2141

Request to run the script for the "Verbal Strengthening" sub-sheet in the Technical PSP sheet

Added by chinnu sarah thomas over 2 years ago. Updated over 2 years ago.

Status:
New
Priority:
Immediate
Start date:
06/03/2022
Due date:
% Done:

0%

Estimated time:

Description

We have changed the URL link for Learn about Modifier Placement (Row 444) task in the Verbal Strengthening sub-sheet of the Technical PSP sheet (https://docs.google.com/spreadsheets/d/1SnltuMIxJmNmg4t8ouJitdAsdpHvgKVTS4YrcXNuyQ4/edit#gid=85345293).

Could you please run a script to ensure that the ETPF students are able to access the new link on their study plan?

Additional Details
Additional Assignee
#1

Updated by poojesshwaran V over 2 years ago

  • Assignee changed from poojesshwaran V to chinnu sarah thomas

Updated

Also available in: Atom PDF