Project

General

Profile

Bug #2939

TOEFL study plan to be updated

Added by Aswathy Aswathy Mohandas 6 months ago.

Status:
New
Priority:
Immediate
Start date:
05/06/2024
Due date:
% Done:

0%

Estimated time:
factor:

Description

Hi, as per our discussion over the call today, please update the TOEFL study plan with the changes as soon as possible. The changes are listed on the following spreadsheet:https://docs.google.com/spreadsheets/d/1qrT4LjsLyYpeMefiMeiSZyJbkQIuYUYdYBdVHftOMU8/edit?usp=sharing

I'm also attaching the same as an image below.


Files

TOEFL study plan changes.png (25.9 KB) TOEFL study plan changes.png Aswathy Aswathy Mohandas, 05/06/2024 12:13 PM
Additional Details
Additional Assignee

No data to display

Also available in: Atom PDF